Note: Only forum leaders may delete posts.
*HTML is ON *UBB Code is ON Smilies Legend
Smilies Legend
[b]Third attempt at wet dress rehearsal halted due to liquid hydrogen leak[/b] While loading liquid hydrogen (LH2) on the Space Launch System's core stage on Thursday afternoon (April 14), engineers detected a leak on the tail service mast, which is located at the base of the mobile launcher and connects to the core stage. Though engineers stopped loading LH2 and liquid oxygen (LOX) on the core stage, the launch director gave approval for teams to chill down the Interim Cryogenic Propulsion Stage (ICPS) LH2 lines to collect additional data and have completed that activity. Engineers will not load LH2 or LOX into the ICPS tanks, due to an issue with a helium check valve experienced several days ago. When teams paused propellant loading earlier today, there was about 49% of LOX on the core stage and about 5% of LH2 was loaded into the core stage tank prior to the hydrogen leak. The terminal countdown will not occur today due to the modified configurations and delays with propellant loading. Teams are reassessing the next steps and will determine a go-forward plan following today's test.
Contact Us | The Source for Space History & Artifacts
Copyright 1999-2024 collectSPACE. All rights reserved.